Fusion Bonded Epoxy (FBE), EN 301A

EN 301A is a thermosetting epoxy powder coating system that was engineered to protect pipelines from corrosion in the most demanding operating environments. EN 301A is designed to be used as a primer layer for 3LPE or 3LPP system.

This product has been certified to meet the requirements of CSA Z245.20-18 standard.

Powder Properties

Characteristic
Acceptance criteria
Test Standard
Color
Green
Visual Color-Pass
Moisture Content (%)
<0.5%
CSA Z245.20 Section 12.4
Particle Size
Larger than 250 µm <0.2% Larger than 150 µm <3.0%
CSA Z245.20 Section 12.5
Density (g/cm3)
1.45±0.05
CSA Z245.20 Section 12.6 CSA Z245.20 Section 12.6
Thermal Properties
Tg2: ≥98℃
CSA Z245.20 Section 12.7
ΔH=45±10J/g
Gel time (200℃ s)
20±5
CSA Z245.20 Section 12.2
Cure time (230℃, min)
≤3min
CSA Z245.20 Section 12.7

Film Properties

Characteristic
Acceptance Criteria
Test Standard
Cathodic Disbondment
48 Hours, -1.5 volt, 65℃ 28 Days, -1.5-volt, 23℃
2.5 mm Average 3.0 mm Average
CSA Z245.20 Section 12.8
Flexibility
bending, -30℃,3°
No Cracking
CSA Z245.20 Section 12.11
Impact Resistance
1.5 J, -30℃
No Holidays
CSA Z245.20 Section 12.12
Hot Water Resistance
48 Hours, 75℃
1 Rating
CSA Z245.20 Section 12.14
Thermal Properties
ΔTg ,℃
|ΔTg|≤5
CSA Z245.20 Section 12.7

Preparation of the specimen

  1. Abrasive blasting to Sa2.5 near-white metal with surface profile of 50-100 microns. Then, clean the surface with high pressure gas
  2. Put the specimen into the oven (200℃), preheat 40-50min
  3. Spray the powder to the preheated specimen with electrostatic spray gun, then place it in the oven, keep it there for 5-10 minutes at 200℃, then cool it to room temperature.
  4. The dry film thickness should be 350±50µm

Specifications

Surface Preparation
Remove all surface contamination before abrasive blasting. Blast clean using steel grit to Sa2.5 near-white metal with a minimum surface profile of 50-100microns.
Application
Factors such as plant capability, specifications, and pipe construction or characteristics can affect application conditions. The recommended application temperature range for 3PE 3PP systems is 180-220ºC.
Recommended Film Thickness(µm)
120~350μm
Storage
1. The product should be stored in a cool, ventilated, dry room with temperature below 30℃ and humidity below 65%. 2. Keep away from fire and heat and tide. 3.After use, it should be sealed in time to prevent powder from being been polluted and damped. 4. Reduce the number of movements to avoid impact and pressure. 5. The maximum stacking height should not exceed 5 layers.
Package and Handling
The package is a 25kg box, lined with polyethylene plastic bags. During shipment, it should be loaded or unloaded lightly and avoid direct sunlight, heat, and moisture.
Shelf Life
12months
Theoretical Coverage
0.69 m2/kg/mm